As NASA on Saturday resumed its second effort to get its new 30-story rocket
off the ground and send its uncrewed test capsule toward the Moon, engineers
detected a fuel leak that potentially could lead to a new delay.
With millions around the globe and hundreds of thousands on nearby beaches
waiting for the historic launch of the massive Space Launch System (SLS), a
leak near the base of the rocket was found as ultra-cold liquid hydrogen was
being pumped in.
NASA said engineers would "stop flowing liquid hydrogen to the tank, close
the valve used to fill and drain it," then try to reseal it.
The space agency offered no information on the likelihood of a new delay in
the Artemis program -- which aims eventually to return a human crew to the
Moon -- following Monday's aborted effort.
Saturday's launch is still scheduled for 2:17 pm (1817 GMT) from Kennedy
Space Center in Florida. It can be delayed by up to two hours if necessary.
"Our team is ready," Jeremy Parsons, deputy manager of exploration ground
systems at Kennedy Space Center, had said Friday.
"They are getting better with every attempt and actually performed superbly
during launch countdown number one... I think if the conditions with weather
and the hardware align, we'll absolutely go."
Though the area around the launch site will be closed to the public, an
estimated 400,000 people were gathering on beaches nearby to see -- and hear
-- the most powerful vehicle that NASA has ever launched climb into space.
The initial launch attempt was halted after engineers detected a fuel leak
and a sensor showed that one of the rocket's four main engines was too hot.
Both issues have since been resolved, the launch team said.
Shortly before 06:00 am (1000 GMT) Saturday, launch director Charlie
Blackwell-Thompson had given the go-ahead to start filling the rocket's
tanks with cryogenic fuel.
About three million liters of ultra-cold liquid hydrogen and oxygen was
expected to be pumped into the spacecraft.
And the weather appeared to be cooperating: the US Space Force predicts a 60
percent chance of favorable weather at the scheduled liftoff time, growing
to 80 percent later in the launch window.
If something requires NASA to stand down again on Saturday, there are backup
opportunities on Monday or Tuesday. After that, the next launch window will
not be until September 19, due to the Moon's position.
The purpose of the Artemis 1 mission is to verify that the Orion capsule,
which sits atop the SLS rocket, is safe to carry astronauts in the future.
Mannequins equipped with sensors are standing in for astronauts on the
mission and will record acceleration, vibration and radiation levels.
- Apollo's twin sister -
It will take several days for the spacecraft to reach the Moon, flying
around 60 miles (100 kilometers) at its closest approach. The capsule will
fire its engines to get to a distant retrograde orbit (DRO) of 40,000 miles
beyond the Moon, a record for a spacecraft rated to carry humans.
The trip is expected to last around six weeks and one of its main objectives
is to test the capsule's heat shield, which at 16 feet in diameter is the
largest ever built.
On its return to Earth's atmosphere, the heat shield will have to withstand
speeds of 25,000 miles per hour and a temperature of 5,000 degrees
Fahrenheit (2,760 degrees Celsius) -- roughly half as hot as the Sun.
Artemis is named after the twin sister of the Greek god Apollo, after whom
the first Moon missions were named.
Unlike the Apollo missions, which sent only white men to the Moon between
1969 and 1972, Artemis missions will see the first person of color and the
first woman step foot on the lunar surface.
Fittingly, NASA's first woman launch director, Blackwell-Thompson, will give
the final "go" for liftoff on Saturday.
A successful Artemis 1 mission will come as a huge relief to the US space
agency, after years of delays and cost overruns.
A government audit estimates the program's cost will grow to $93 billion by
2025, with each of its first four missions clocking in at a whopping $4.1
billion per launch.
The next mission, Artemis 2, will take astronauts to the Moon without
landing on its surface.
The crew of Artemis 3 is to land on the Moon in 2025 at the earliest, with
later missions envisaging a lunar space station and a sustainable presence
on the lunar surface.
According to NASA chief Bill Nelson, a crewed trip to the red planet aboard
Orion, which would last several years, could be attempted by the end of the
2030s.
Source: Link
Tags:
Space & Astrophysics